group8
All projects

Malley-Gare

Real EstateBureaux et commercesEspaces culturels et sportifsHôtel et RestaurantLausanneBéton
mag2_171109_image-place-low-2.jpg

The construction is based on an archetype rooted in the industrial memory of the site, expressed through concrete frames infilled with natural stone in a beige–reddish palette. The extrusion of the unitary block form generates an urban figure tailored to the site’s characteristics: shielding from nuisances on the rail-side, a calm and tree-planted courtyard at its core, and a simple, well-oriented tower addressing the larger scale. The block is divided into programmatic units and unified by a shared green roof.

The programs are rigorously separated into four buildings, each with its own access and internal logic. The hotel, positioned at the corner, opens onto Place de la Coulisse to welcome guests. The medical center offers great programmatic flexibility and benefits from a direct address onto the street. Offices are located in the lower part of the tower, easily adaptable to large or small units. Above, the apartments are designed to maximize distant views, featuring loggias scaled to the landscape.

mco_mag_plan.jpg
mag2_171109_image-nuit-HD.jpg
mag2_171109_image-cour-low-2.jpg
mag2_171031_image-1-low-2.jpg
mco_mag_plan_3.jpg
mco_mag_plan_4.jpg
mco_mag_plan_5.jpg
mco_mag_plan_2.jpg
mco_mag_plan_6.jpg
mco_mag_plan_7.jpg
mco_mag_plan_10.jpg
mco_mag_plan_11.jpg
mco_mag_plan_8.jpg
mco_mag_plan_9.jpg
mco_mag_plan_12.jpg

INFOS

Location
Renens-Prilly, Vaud
Year
2017 - 2018
Program
Logements, bureaux, clinique médicale, hôtel et restaurants
Specifications
Programmatic mix, typological flexibility, development along the CFF railway tracks
Client
CFF Immobilier
Mandate
Competition, winning project
Landscaping
Hager Partner AG
Engineering
WaltGalmarini AG, srg | engineering SA, Energestion SA
Image credits
© Thomas Sponti
Next project

School complex of Vernets

mco_gsv_persp02_recadree.jpg
Office
Loading...
Malley-Gare