group8
All projects

Training sports hall, Macolin

Équipement publicBerneBois
group8_macollin_da.jpg

The two new halls are combined in a new building separate from the existing structure in order to respect the scale of the site. A public space connects the two buildings and ensures efficient flow and circulation. The superimposition of the two halls creates a compact structure. Wood was the obvious choice given the omnipresent forest character of the site. The corbelled arrangement of the facade system protects the wood from the elements and ensures the building's durability.

The location of the triple east/west hall creates a space that benefits from optimal light without glare. The south-facing wrestling hall benefits from light filtered by the forest. The lower rooms are arranged in a staircase pattern to minimize the amount of rock excavation required. The ceiling of the wrestling hall, which forms the floor of the gym, is made of concrete due to the load, spans, acoustics, and rigidity required. From the level of the triple gymnastics hall upwards, the entire structure is made of wood. With the aim of creating a sustainable construction with low environmental impact, wood was used wherever reasonably possible. The entire gymnastics hall and its ancillary rooms are thus made entirely of wood, while concrete construction is limited to the wrestling hall and the lower rooms in contact with the ground.

mco_macolin_80.jpg
mco_macolin_9.jpg
mco_macolin_10.jpg
mco_macolin_11.jpg
mco_macolin_7.jpg
mac-3_2025-09-17-151614_pjaa.jpg
mco_macolin.jpg
mco_macolin_2.jpg
mco_macolin_4.jpg
mco_macolin_5.jpg
mco_macolin_6_2025-09-17-151402_mwat.jpg
group8_macollin_da12_low.jpg

INFOS

Location
Macolin, Berne
Year
2017
Client
Office fédéral des constructions et de la logistique (OFCL)
Type de mandat
Concours en procédure ouverte à un degré SIA 142, 7e prix
Next project

Palexpo park hotel

hop-1.jpg
Office
Loading...
Training sports hall, Macolin